HOME/PROJECTS

Projects

Work that reveals what’s below the surface.

SUE · QL-B MODELDRAG · SCROLL TO ZOOM

Sectors

Where we work.

The same four controlled steps on every project: Define, Control, Verify, Deliver.

Municipal infrastructure

Watermain, sewer and road reconstruction where records are incomplete and conflicts surface during design.

Land development

Subdivision and site plan work from pre-design SUE through locate management during servicing.

Utility and energy

Corridor investigations, crossing verification and locate support for owner and operator programs.

Transportation

Road, transit and bridge projects where subsurface conflicts drive schedule and cost.

Selected work

Recent projects.

Client names are withheld. References are available on request.

Urban infill redevelopment, view 1 of 3Urban infill redevelopment, view 2 of 3Urban infill redevelopment, view 3 of 3

DOWNTOWN TORONTO

Urban infill redevelopment

QL-B SUE around a full downtown block before redevelopment design. Watermains, combined and storm sewers, hydro vaults and multiple fibre and copper telecom plants were designated, with structure inverts measured and tied to the survey base.

QL-BX · SUEY · SURVEY
Arterial corridor reconstruction SUE, view 1 of 3Arterial corridor reconstruction SUE, view 2 of 3Arterial corridor reconstruction SUE, view 3 of 3

WOODSTOCK

Arterial corridor reconstruction SUE

QL-B and QL-C investigation along a 2 km arterial ahead of county reconstruction design. Gas, water, sewer, hydro, street lighting and telecom were designated, structures inspected and inverts measured, then merged into the engineering survey base.

QL-B / QL-CX · SUEY · SURVEY
Feeder route connection, view 1 of 3Feeder route connection, view 2 of 3Feeder route connection, view 3 of 3

BARRIE

Feeder route connection

True orthophoto capture of the right-of-way with designated telecom and hydro plant overlaid, so a new electrical feeder alignment could be set against existing infrastructure.

X · LOCATINGY · SURVEYORTHO
Residential redevelopment frontage, view 1 of 3Residential redevelopment frontage, view 2 of 3Residential redevelopment frontage, view 3 of 3

BAYVIEW AVENUE · GTA

Residential redevelopment frontage

QL-B investigation along a busy arterial frontage ahead of site design. A dense corridor of high-pressure and service gas, hydro, Bell, Rogers, watermain, sanitary and storm was separated and plotted line by line.

QL-BX · SUEY · SURVEY
Base mapping and subsurface utility investigation, view 1 of 3Base mapping and subsurface utility investigation, view 2 of 3Base mapping and subsurface utility investigation, view 3 of 3

RESIDENTIAL SUBDIVISION

Base mapping and subsurface utility investigation

Topographic base mapping and SUI across an established neighbourhood, with each utility classified from QL-D records through QL-A verification for design.

QL-A TO DX · SUEY · SURVEY
Site-wide electrical and water mapping, view 1 of 2Site-wide electrical and water mapping, view 2 of 2

LARGE CAMPUS · GTA

Site-wide electrical and water mapping

Electrical and water networks traced across a large multi-building campus and delivered as a site-wide map, so the owner can plan site works against what is really in the ground.

X · LOCATINGY · MAPPINGORTHO

Next step

Tell us what needs to be clear before you dig.